1. Listing of major pending transactions classified as Category A that require submission of an environmental and social impact assessment.

Each of the following transactions has been classified as Environmental Category A, and for these transactions, Ex-Im Bank requires that an Environmental and Social Impact Assessment (ESIA) be forwarded by the applicant for Ex-Im Bank's review. Ex-Im Bank also requires that a notice of the availability to interested parties of the ESIA be posted on this site for at least 30 days prior to any issuance of a final commitment.

Interested parties wishing to receive a copy of the ESIA in order to offer constructive comments or to provide pertinent information to Ex-Im Bank on environmental and social issues raised by the underlying project should direct their request to Enviro.Specialist@exim.gov.

If you have difficulty accessing this mailbox, please contact Ex Im Bank at:

Export-Import Bank of the U.S.
Engineering and Environment Division
811 Vermont Ave N.W.
Washington D.C. 20571

Phone (202) 565-3570

Environmental and Social Impact Assessments for the following transaction(s) are (or will shortly become) available

ProjectLocationReferenceFurther NEPA action required?1Estimated Annual CO2 Production
(tonnes/yr)
Project
Posting Date
Date ESIA Available
Tasiast Gold Mine Expansion Project280 kilometers north of Nouakchott, Inchiri Region, MauritaniaAP086514XX TBD11/25/14Not Yet Available
Tamar Gas Field Expansion & Compressor StationOffshore Northern Israel (Gas Field) and onshore southern Israel (Compressor Station)AP088873xxNo(1)TBD08/19/14 Not Yet Available

Tahrir Petrochemical Complex

Suez Industrial Area, Ain Sokhna, Egypt

AP086890xx  3/13/12Not Yet Available

Footnotes:
1 Based on Ex-Im Bank's review of the proposed transaction, Ex-Im has concluded:
(1) No major Federal action.
(2) Categorical exclusion applies.

2. List of major pending transactions classified as Category B
Interested parties wishing to provide information to Ex-Im Bank's Engineering and Environment Division about potential environmental issues raised by the following projects should direct their comments to Enviro.Specialist@exim.gov.

ProjectLocationReferenceFurther NEPA action required?1Estimated Annual CO2  Production
(tonnes/yr)
Project
Posting Date
ESIA (or other information) available2
Pemex Oil & Gas Exploration and ProductionOnshore and Offshore North and Eastern, MexicoAP088970xxNo(1)n/a2,700,000Not available
Bac Lieu 87MW WindfarmBac Lieu, VietnamAP088627xx---n/a11/17/14Not available
Yaoundé Water Supply ProjectYaoundé, CameroonAP088021xx---n/a11/17/14Not available
Tibetan Sheep International Carpet Manufacturing FacilityXining, ChinaAP088839xx  8/6/14Not available
Platform Drilling RigBay of Campeche, MexicoAP088844xx---35,000 tonnes/year07/28/14 Not available
Conversion of existing Azito Power Plant from 290 MW two-unit, simple cycle gas-fired plant to 420 MW combined cycle plant. (Phase III Conversion)Azito Village, Abidjan, Republic of Ivory CoastAP088709xxNo(1)No increase to plant’s existing fuel consumption or CO2 emissions.07/11/14 Available 07/11/14
Waste to Energy Plant to produce 1.67MW of power and 210,000 gallons of diesel fuel/yr)Saltillo and Monterrey, MexicoAP088200xx02/24/14Not Available
Pan American Energy Oil/Gas DevelopmentGolfo San Jorge Basin, Southern ArgentinaAP088250xxNo(1)687,00001/06/14Not Available
Shanghai Fab 8 Semiconductor PlantPudong New Area, Shanghai, ChinaAP088009xxNo(1)112,66211/08/13Not Available
Aluminum Can ManufacturingZhejiang Province, Guangdong Province, and Longkou Province, ChinaAP087510xx  8/28/13Not Available
Marcona Y Tres Hermanas 120MW WindfarmNasca, PeruAP087793xx  8/5/13Not Available
Orosi 50MW WindfarmLiberia, Costa RicaAP085968xx  8/5/13Not Available
Talas1 50MW WindfarmTrinidad, UruguayAP087794xx  6/7/13Not Available
Pemex Oil & Gas Exploration and ProductionOnshore and Offshore North and Eastern MexicoAP088773xxNo(1)TBD6/03/14Not Available
Condensate Refinery ExpansionWestern KazhakstanAP088545xx---104,0006/03/14Available 06/03/14
124MW Gas Turbine Power Plant ExpansionBuykkaristiran, Luleburgaz, Kirklareli, Thrace Region, TurkeyAP088461xxNo(1)TBD6/03/14Not Available